LW-13/30 Nitrogen Compressor – Medium-Capacity Oil-Free N2 Booster for 3.00 MPa High-Pressure Process Applications

Description

LW-13/30 Nitrogen Compressor – Medium-Capacity Oil-Free N2 Booster for 3.00 MPa High-Pressure Process Applications

Engineered to deliver 13 m³/min at 3.00 MPa discharge pressure, the LW-13/30 is a two-stage, three-row oil-free piston nitrogen compressor designed for high-pressure nitrogen injection, gas liquefaction booster duty, and demanding petrochemical process applications. Zero oil contamination, continuous-duty rated, and built for 24/7 industrial reliability at elevated pressure.

 

उत्पाद अवलोकन

The LW-13/30 nitrogen compressor occupies a critical position within our oil-free piston compressor portfolio, bridging the gap between medium-capacity boosters and high-pressure process compressors. With a rated capacity of 13 m³/min and an exceptional 3.00 MPa discharge pressure, this unit is purpose-built for applications where both substantial flow and elevated pressure are non-negotiable requirements.

What distinguishes the LW-13/30 from conventional alternatives is its fully oil-free compression pathway. The piston rings and rider bands are precision-machined from advanced self-lubricating PTFE composite materials that operate without any hydrocarbon lubricants, ensuring the nitrogen stream remains completely uncontaminated. This intrinsic oil-free characteristic achieves ISO 8573-1 Class 0 certification natively, eliminating the capital expenditure and ongoing maintenance burden of downstream oil-removal filtration systems that would be mandatory with lubricated alternatives.

The compressor architecture employs a two-stage, three-row (二列三级) configuration—a unique arrangement that divides the total pressure ratio across three compression cylinders arranged in two rows. This staged approach is essential for managing the extreme thermal loads associated with 3.00 MPa discharge pressure while preserving the integrity of the PTFE sealing elements. Each stage features an independent intercooler, ensuring gas temperatures remain within safe operating envelopes even during sustained maximum-capacity operation. The robust cast-iron frame and dynamically balanced forged steel crankshaft are rated for a minimum service life of 120,000 hours under standard maintenance protocols.

LW-13/30 nitrogen compressor three stage high pressure piston assembly

Technical Specifications – LW-13/30

Parameter Value Unit
नमूना एलडब्ल्यू-13/30
नमूना Two-stage, Three-row (二列三级)
क्षमता 13 m³/min
डिस्चार्ज दबाव 3.00 एमपीए
Compressor Size (L × W × H) 2860 × 1685 × 2610 mm
वज़न 6.60 t
शक्ति 160 किलोवाट
वोल्टेज 380 V
गैस माध्यम Nitrogen (N₂)
Lubrication बिना तेल का

* All specifications are rated at standard reference conditions (ISO 1217, Annex C). Actual performance may vary based on site altitude, ambient temperature, and inlet conditions.

Key Features & Engineering Advantages

1. Three-Stage Compression for Extreme Pressure Ratios

The LW-13/30 employs a unique two-stage, three-row (二列三级) architecture that divides the extreme pressure ratio required for 3.00 MPa discharge across three compression cylinders. This multi-stage approach is thermodynamically essential because a single-stage or even two-stage compressor would generate discharge temperatures exceeding the safe operating limit of PTFE sealing materials (approximately 180°C). By splitting the compression work across three stages with two inter-stage coolers, the LW-13/30 maintains per-stage discharge temperatures below 155°C, preserving PTFE ring integrity and extending valve plate life by approximately 50% compared to two-stage designs attempting equivalent pressure ratios. The three-row arrangement also provides improved force balance compared to single-row configurations, reducing foundation requirements.

2. High-Pressure Oil-Free PTFE Composite Sealing

The LW-13/30 utilizes a proprietary self-lubricating piston ring and rider band assembly manufactured from high-density PTFE composites specifically formulated for high-pressure, high-temperature service. These rings are reinforced with glass fiber and bronze particulates to achieve a coefficient of friction below 0.05 without any external hydrocarbon lubrication. At 3.00 MPa discharge pressure, the partial pressure of oil vapor would be extremely high in a lubricated compressor, making downstream oil removal virtually impossible. The oil-free design achieves native ISO 8573-1 Class 0 compliance, eliminating the need for coalescing filters, activated carbon adsorbers, and oil monitoring instrumentation that would add significant capital and operating costs to a lubricated system.

3. Reinforced Frame for High-Pressure Mechanical Loads

The main frame is cast from GG25 gray cast iron with significantly reinforced wall sections, additional ribbing, and integral cooling water passages. The high-pressure cylinders feature thicker walls and enhanced structural support to withstand the peak gas forces associated with 3.00 MPa operation. The three-row arrangement distributes the mechanical loads across multiple crankshaft throws, reducing the peak bearing loads per cylinder and improving overall crankshaft longevity. The frame is dynamically analyzed using finite element modeling to ensure stress concentrations remain within safe limits under all operating conditions, including emergency shutdown transients.

4. Standard 380V Drive with High-Torque Motor

The LW-13/30 is driven by a 160 kW, 380V, 50Hz three-phase induction motor rated to IEC 60034-1 efficiency class IE3. The motor is specifically selected for high starting torque to overcome the substantial initial resistance of the three-row compression train. The standard 380V configuration integrates directly into existing low-voltage industrial distribution panels without requiring medium-voltage infrastructure, making this high-pressure compressor accessible to a wide range of industrial facilities. For sites with 6kV or 10kV bus systems, an optional motor with integrated step-down transformer can be supplied.

LW-13/30 nitrogen compressor general assembly three row high pressure design

Application Scenarios

High-Pressure Nitrogen Injection for Enhanced Oil Recovery

In oil and gas production, the LW-13/30 serves as a high-pressure nitrogen injection compressor for enhanced oil recovery (EOR) and miscible gas flooding operations. The 3.00 MPa discharge pressure is sufficient for injecting nitrogen into reservoirs at depths up to 2,000 meters, where the formation pressure requires high injection pressures to achieve effective displacement. The 13 m³/min capacity can serve multiple injection wells simultaneously through a centralized high-pressure distribution manifold. The oil-free design is critical in EOR applications because any oil contamination in the injected nitrogen would damage the reservoir formation, reduce permeability, and compromise oil recovery efficiency.

LW-13/30 nitrogen compressor high pressure injection enhanced oil recovery

Gas Liquefaction & Cryogenic Process Booster

In nitrogen liquefaction plants and cryogenic process facilities, the LW-13/30 nitrogen booster compresses nitrogen from the liquefier cold end or storage vaporizer to the pressure required for distribution or further processing. The 3.00 MPa discharge pressure is adequate for feeding high-pressure nitrogen into cryogenic storage systems, driving nitrogen through multi-pass heat exchangers, and supplying high-pressure nitrogen for supercritical fluid extraction processes. The oil-free design prevents contamination of the cryogenic equipment, where even trace oil would freeze and block heat exchanger passages, causing costly shutdowns and equipment damage.

Petrochemical High-Pressure Reactor Inerting

In petrochemical and chemical synthesis operations, the LW-13/30 provides high-pressure nitrogen for reactor inerting, catalyst bed preservation, and emergency depressurization. The 3.00 MPa discharge pressure is sufficient to maintain positive inert gas blankets in high-pressure reactors operating at 2.00–2.50 MPa, preventing explosive vapor formation and protecting catalyst beds from oxidation during startup and shutdown. The 13 m³/min capacity can serve multiple reactors or process units through a centralized high-pressure nitrogen header. The oil-free certification is mandatory because any oil contamination would poison catalysts, degrade product quality, and create safety hazards in oxygen-sensitive processes.

LW-13/30 nitrogen compressor petrochemical high pressure reactor inerting

High-Pressure Pipeline Testing & Commissioning

Natural gas pipelines, petrochemical process piping, and high-pressure vessel systems require nitrogen for hydrostatic testing, pneumatic testing, and commissioning purge operations. The LW-13/30’s 3.00 MPa discharge pressure is suitable for pressure testing systems rated up to 2.50 MPa design pressure (with appropriate safety margins per ASME B31.3). The 13 m³/min capacity allows rapid pressurization of large-diameter pipelines and vessels, reducing commissioning time. The oil-free design ensures that test nitrogen does not introduce contaminants that would require post-test cleaning or compromise the integrity of sensitive process systems.

Material & Construction

The LW-13/30 is constructed from premium materials selected for extreme high-pressure nitrogen compatibility, thermal resistance, and extended operational life:

Component Material Specification
Cylinder Block (LP Stage) Gray Cast Iron GG25 / HT250, standard wall thickness
Cylinder Block (IP Stage) Gray Cast Iron GG25 / HT250, reinforced wall + ribbing
Cylinder Block (HP Stage) Gray Cast Iron GG25 / HT250, heavy reinforced wall + ribbing
Crankshaft Forged Alloy Steel 42CrMo4, Q&T, ISO 1940 G2.5 balanced
Piston Rings PTFE-Glass-Bronze Composite High-pressure rated, self-lubricating, 185°C max
Rider Bands PTFE Composite Piston guidance, anti-scuffing, wear rate <0.03 mm/1000h
Valve Plates Stainless Steel SS316, high-pressure concentric ring design
Intercoolers (2 units) Carbon Steel Shell / SS316 Tubes ASME VIII Div.1, 1.5× hydrotest, 30 min hold
Aftercooler Carbon Steel Shell / SS316 Tubes High-pressure finned tube, 32°C cooling water
High-Pressure Piping Seamless Stainless Steel SS316, ANSI Class 900 flanges

All pressure-bearing components are designed and fabricated in strict accordance with ASME BPVC Section VIII Division 1 or Chinese GB 150 standards. Every weld joint undergoes 100% radiographic inspection (RT) per ASME Section V, Article 2, and each completed pressure vessel is subjected to a hydrostatic pressure test at 1.5 times the maximum allowable working pressure (MAWP) for a minimum hold period of 30 minutes. High-pressure piping systems are fabricated from seamless SS316 with ANSI Class 900 flanged connections to ensure leak-tight integrity at 3.00 MPa operating pressure.

LW-13/30 nitrogen compressor factory precision machining high pressure testing

Installation & Maintenance Guidelines

Foundation & Structural Requirements

The LW-13/30 has a dry weight of 6.60 tonnes and a center of gravity approximately 850 mm above the baseplate. Despite the three-row design, the opposed-cylinder arrangement provides reasonable force balance, permitting installation on a reinforced concrete inertia block of 10–12 tonnes. The block should be mounted on elastomeric vibration isolators (natural frequency 6–8 Hz). Minimum clearance requirements: 1.5 m on the non-drive side for valve access, 1.2 m on the drive side for motor maintenance, and 2.0 m overhead for crane access. The high-pressure discharge piping must be properly supported with spring hangers or flexible supports to prevent thermal expansion stress and vibration-induced fatigue at 3.00 MPa.

Cooling Water System Design

Cooling water demand is approximately 25 m³/h at an inlet temperature not exceeding 32°C. The water distribution circuit supplies the cylinder jackets and two intercoolers in parallel. Given the extreme pressure ratio, both intercoolers are critical for thermal management and must receive priority cooling water flow. Water quality specifications: pH 6.5–8.5, total dissolved solids < 500 mg/L, chloride content < 50 mg/L (to prevent SS316 tube corrosion), suspended solids < 30 mg/L, and total hardness < 300 mg/L as CaCO₃. A closed-loop cooling tower with side-stream filtration and chemical treatment is strongly recommended for all installations.

Preventive Maintenance Schedule

Interval Service Item Action Required
Daily Operational Inspection Check vibration, abnormal noise, cooling water flow, discharge pressure, temperature, oil levels
250 hours Valve Plate Inspection (All Stages) Remove and inspect suction/discharge valves for carbon deposits, spring fatigue, cracking
1,000 hours Piston Ring Wear Assessment (All Stages) Measure groove clearance; replace rings if clearance exceeds 0.18 mm
3,000 hours Intermediate Overhaul Replace all piston rings, rider bands, and valve plate assemblies across all three stages
6,000 hours Major Overhaul Inspect crankshaft journals, measure main bearing clearances, replace bearings if >0.06 mm

The oil-free design of the LW-13/30 dramatically reduces maintenance complexity compared to lubricated alternatives. There are no oil changes, no oil analysis, no filter replacements, and no separator cartridge changes. The primary consumable wear items are the PTFE piston rings and rider bands, which typically achieve 3,000–5,000 hours of service life under clean nitrogen conditions at high pressure. The three-stage design distributes wear more evenly than two-stage configurations, reducing the frequency of major overhauls.

LW-13/30 nitrogen compressor workshop assembly and quality inspection

Compliance & Safety Certifications

The LW-13/30 nitrogen compressor is designed, manufactured, and tested to meet or exceed the following international standards and regulatory frameworks:

Pressure Equipment
ASME BPVC Section VIII Div.1, GB 150-2011, PED 2014/68/EU Module A
Electrical & Machine Safety
IEC 60034-1 (IE3 efficiency), IEC 60204-1, ISO 12100 machinery safety
Oil-Free Certification
ISO 8573-1 Class 0 (Oil Content), independently tested by TÜV Rheinland
Quality & Environmental
ISO 9001:2015, ISO 14001:2015
⚠️ Critical Safety Advisory – Ultra High-Pressure Operation

Nitrogen is classified as a simple asphyxiant gas. At 3.00 MPa discharge pressure, the risk of rapid gas release and oxygen displacement is severely elevated. All LW-13/30 installations must incorporate continuous oxygen deficiency monitoring in the compressor room and all adjacent areas. High-pressure discharge piping must be equipped with pressure relief valves rated at 110% of MAWP and rupture discs as secondary protection. All high-pressure connections must be verified with ultrasonic leak detection before commissioning. Ventilation systems must maintain ambient oxygen above 19.5% per OSHA 29 CFR 1910.146. Emergency shutdown interlocks should activate at 19.5% O₂ (alarm) and trigger automatic isolation at 18.0% O₂ (hard shutdown). Personnel must be trained in high-pressure gas safety protocols and wear appropriate PPE before operating or maintaining this equipment.

LW-13/30 nitrogen compressor ISO certification and compliance documentation

Performance & Efficiency Analysis

The LW-13/30 achieves a specific power consumption of approximately 12.31 kW per m³/min of nitrogen delivered at 3.00 MPa discharge pressure. This specific power figure reflects the thermodynamic reality of ultra-high-pressure compression, where the work required increases substantially with pressure ratio. Within the high-pressure oil-free piston compressor segment (discharge pressure >2.50 MPa), this efficiency is highly competitive and significantly superior to diaphragm compressors, which are the primary alternative for oil-free high-pressure service. For comparison, oil-lubricated reciprocating compressors in similar ultra-high-pressure applications typically consume 13.0–15.0 kW/m³/min, while diaphragm compressors may exceed 18 kW/m³/min.

Over an 8,000-hour annual operating cycle, the LW-13/30’s efficiency advantage versus less efficient alternatives yields approximately 52,000–104,000 kWh of annual energy savings. At $0.08/kWh, this represents $4,160–$8,320 in direct electricity cost reduction per year. However, the primary economic justification for the LW-13/30 is typically the elimination of oil-related consumables and the avoidance of downstream oil-removal equipment that would be mandatory with lubricated alternatives. The total cost of ownership for ultra-high-pressure nitrogen compression is reduced by an estimated 25–35% over a 10-year operational life when oil-free operation is compared to lubricated systems with full downstream purification.

The absence of oil in the compression path is particularly valuable at 3.00 MPa because oil contamination becomes exponentially more concentrated and more difficult to remove as pressure increases. At this pressure level, even advanced coalescing filters and activated carbon systems struggle to achieve sub-ppm oil content, and the energy penalty of operating such systems becomes substantial. The LW-13/30’s native oil-free design eliminates this challenge entirely.

Customization & OEM Capabilities

We offer extensive customization options to adapt the LW-13/30 to specific site conditions, integration requirements, and end-user specifications:

  • Skid-Mounted Turnkey Packages: Pre-assembled compressor, motor, intercoolers, aftercooler, high-pressure discharge piping, instrumentation, and control panel on a structural steel skid. Factory pre-testing of all systems reduces commissioning time by 60%.
  • Hazardous Area Configurations: ATEX Zone 2 and IECEx compliant motor and electrical enclosures for petrochemical installations. Integrated gas detection and automatic ventilation interlocks.
  • Advanced Process Control: Siemens S7-1200 or Allen-Bradley CompactLogix PLC with 10-inch HMI touchscreen, remote monitoring via Modbus TCP/IP or OPC-UA, and DCS/SCADA integration. High-pressure safety interlocks including automatic unload on overpressure and emergency isolation valves.
  • Environmental Protection: C5-M marine-grade coatings for coastal installations; tropicalized electrical components for 55°C ambient; IP54-rated acoustic enclosures reducing noise from 85 dB(A) to 72 dB(A).
  • OEM & Private Label: Custom paint colors, branded nameplates, and localized documentation for gas equipment distributors and system integrators.

Custom configurations are available from MOQ 1 unit. Engineering proposals are typically delivered within 5–7 business days. Standard delivery time is 12–14 weeks; repeat orders are delivered in 8–10 weeks.

LW-13/30 nitrogen compressor custom skid mounted high pressure package

Case Study: LNG Plant Nitrogen Purge & Inerting System

Client: An LNG regasification terminal in Southeast Asia

Challenge: The terminal required a reliable high-pressure nitrogen supply for pipeline purging, storage tank inerting, and emergency nitrogen injection into the LNG vaporization system. The existing oil-lubricated compressor was experiencing oil carryover into the nitrogen stream, contaminating the cryogenic heat exchangers and requiring quarterly cleaning shutdowns. The 2.50 MPa discharge pressure was also insufficient for the new high-pressure pipeline purge requirements. Maintenance costs had reached $95,000/year and unplanned shutdowns were occurring every 3–4 months.

Solution: We supplied an LW-13/30 oil-free nitrogen compressor as the primary high-pressure supply, configured on a custom skid with integrated dual intercoolers, aftercooler, and a Siemens S7-1200 PLC control panel with SCADA integration. The 3.00 MPa discharge pressure met all pipeline purge and tank inerting requirements. The oil-free design eliminated heat exchanger contamination. A 3 m³ surge vessel was installed upstream to buffer demand fluctuations from the intermittent purge operations.

Quantified Results After 24 Months:

  • Nitrogen oil content: Reduced from 2.8 mg/m³ to <0.01 mg/m³, achieving ISO 8573-1 Class 0
  • Cryogenic heat exchanger cleaning frequency: Reduced from quarterly to annually, saving $45,000/year
  • Unplanned shutdowns: Zero events in 24 months versus 6 events in the previous 24 months
  • Annual maintenance cost: Reduced by 48% ($95,000 to $49,400)
  • Pipeline purge capability: Enhanced from 2.50 MPa to 3.00 MPa, meeting new regulatory requirements

“The LW-13/30 has been the most reliable piece of equipment in our nitrogen system. The elimination of oil contamination has solved our heat exchanger fouling problem, and the 3.00 MPa pressure gives us the purge capability we need for regulatory compliance. Our operations team finally has confidence in the nitrogen supply.” — Operations Manager, LNG Terminal

LW-13/30 nitrogen compressor LNG terminal installation case study

FAQ & Selection Guide

What is the expected service life of the LW-13/30?

The LW-13/30 is engineered for a minimum design life of 12 years (approximately 100,000 operating hours) in clean nitrogen service. The cast-iron frame and forged steel crankshaft are rated for the full design life. PTFE piston rings and rider bands are the primary wear components, with replacement intervals of 3,000–5,000 hours under high-pressure conditions. Valve plate assemblies typically achieve 2,000–3,500 hours before requiring refurbishment.

Can the LW-13/30 operate from low-pressure inlet?

Yes. The LW-13/30 can operate from atmospheric or low-pressure inlet (0.03–0.10 MPa), though the three-stage design is optimized for moderate inlet pressures. At atmospheric inlet, the effective capacity may be slightly reduced due to lower gas density. For applications consistently requiring full 13 m³/min capacity from atmospheric inlet, a larger compressor or a dedicated low-pressure booster upstream may be recommended. Our engineering team can evaluate your specific inlet conditions and recommend the optimal configuration.

Is the LW-13/30 suitable for outdoor installation?

The standard LW-13/30 is designed for indoor installation in a ventilated machinery room. For outdoor use, we offer an optional IP54 weatherproof enclosure with space heating (for -20°C climates), solar shields (for 55°C ambient), and forced ventilation. The acoustic enclosure option is strongly recommended for outdoor installations to maintain noise compliance (75 dB(A) at property boundary).

How does the three-stage design benefit high-pressure operation?

The three-stage design is essential for 3.00 MPa discharge pressure because it divides the extreme pressure ratio across three compression cylinders with two inter-stage coolers. Without this staged approach, the discharge temperature would exceed 200°C, destroying PTFE sealing materials and creating a fire hazard. The three-stage design limits per-stage temperatures to 150–155°C, preserving seal integrity and extending valve life by approximately 50% compared to two-stage alternatives. Additionally, the three-row arrangement provides better force balance than single-row designs, reducing foundation requirements and vibration transmission. For a detailed technical comparison, see our nitrogen compressor technology guide.

When should I avoid selecting the LW-13/30?

The LW-13/30 is NOT recommended for: (1) Discharge pressures above 3.50 MPa—consider our ZW multi-stage series or diaphragm compressors for higher pressure requirements; (2) Capacity requirements above 20 m³/min—larger models in the DW or MW series offer better scale efficiency; (3) Applications where discharge pressure is consistently below 1.50 MPa—the three-stage design is over-engineered for low-pressure applications, and standard two-stage models will offer better efficiency and lower capital cost; (4) Continuous flow modulation below 35% of rated capacity—piston compressors experience reduced efficiency at deep turndown.

Related Products & Solutions

DW Series High-Pressure Nitrogen Compressors

Designed for discharge pressures from 0.40 MPa to 2.00 MPa, the DW series covers nitrogen injection, pipeline boosting, and chemical synthesis. Capacities from 2 to 130 m³/min.

Explore DW Series →

ZW Series Multi-Stage Oil-Free Compressors

Vertical, multi-stage oil-free compressors for oxygen, nitrogen, hydrogen, and specialty gases. Discharge pressures up to 9.00 MPa for ultra-high-pressure applications.

Explore ZW Series →

MW Series Medium-Pressure Compressors

Medium-pressure oil-free compressors (1.0–4.0 MPa) for nitrogen recycle, gas liquefaction, and process gas compression in petrochemical operations.

Explore MW Series →

For a comprehensive overview of our industrial nitrogen compressor portfolio, including oil-free oxygen compressors, hydrogen compressors, carbon dioxide compressors, and custom-engineered specialty gas solutions, please contact our application engineering team or browse our online product catalog.

Ready to Upgrade Your Ultra High-Pressure Nitrogen System?

Our application engineers are standing by to evaluate your nitrogen flow requirements, suction conditions, discharge pressure targets, and integration constraints. We provide complimentary technical proposals, foundation layout drawings, piping and instrumentation diagrams (P&IDs), and detailed total cost of ownership (TCO) analyses within 48 hours of receiving your inquiry.

Email: [email protected] | Response within 24 hours